Skip to content

RMIT University, Bundoora Campus

West Spine Stage 2 and 3 project

Bonacci Group provided civil engineering services for the RMIT University, Bundoora Campus project. 

Stage 2

Stage 2 works entailed the construction of the entry Plaza at Plenty Road and incorporated variable width paving, realignment of the temporary carpark, and full design and documentation of a services easement. 

Bonacci Group designed all support structures associated with the landscape features, including pedestrian link bridges, light pole and artwork foundations, as well as precast seating elements. 

Landscape works associated with linking Plenty Rod to the main campus works included all pavements, bridge structure landscape, sculpture features, and alterations to car parks.

Stage 3

Stage 3 works are an integral part of the Bundoora West Spine and have been developed to abut the south side of the Stage 2 works. 

Design and documentation of Stage 3 includes all landscape structures to be contained within each of the various pods. 

Bonacci Group designed all infrastructure to suit this Stage 3 expansion. 

Location: Bundoora, VIC

Sector: Tertiary

Services: Civil Engineering